English
The project is located in the T3 terminal building area of Wuhan Tianhe international Airport to solve the problem of rainwater inflow and drainage, which needs to raise 2550m³/h of rainwater and raise 20m of head.
August 07, 2017
To address this challenge, DENOR has custom-designed a series of high-performance axial flow pumps for Thailand’s municipal rainwater projects, supporting more efficient urban drainage and enhanced public safety.
October 30, 2024
The project is located in Huizhou North Railway Station, which needs an integrated rainwater pumping station to solve the problem of rainwater collection and discharge in the station and culvert so as to ensure the normal operation of the station.
April 07, 2022
The project is located in the urban area of Zhongshan and the water body in the urban area needs to be regulated and upgraded to solve the problems of black odor and resident sewage discharge.
August 03, 2022