English
April 07, 2022
PROJECT INTRODUCTION
The project is located in Huizhou North Railway Station, which needs an integrated rainwater pumping station to solve the problem of rainwater collection and discharge in the station and culvert so as to ensure the normal operation of the station.
PROJECT OUTCOME
Denor has rich experience in the production and technology of large pumping stations, mature and stable product quality and service, and strong control ability of technical personnel on the site. Finally, the project team overcame various difficulties and completed the project construction on time, ensuring the smooth operation of railway transportation.